Rasuwagadhi Hydropower Plant
Key Features of the Project
Type of Project: | Run-of-River (ROR) |
Design Discharge: | 80.00 m3/sec |
Gross Head: | 167.90 m |
Headworks: | Diversion Weir with Undersluice and Side off lake Intake |
Desander type and size: | Underground, 3–Chamber of size125m x15m x12m |
Tunnel Length & Size: | 4203m, Circular section of dia, 6m |
Powerhouse: | Underground Type |
Turbine Type, Orientation & No.: | Francis, Vertical Axis & 3 Nos. |
Unit Capacity: | 38.50 MW |
Generator Unit Capacity & Nos.: | 3 phase Synchronous AC, 3 x 43.75 MVA |
Installed Capacity: | 111 MW |
Annual Salable Energy: | 613.875 GWh |
Dry Energy: | 84.318 GWh |
Wet Energy: | 529.557 GWh |
Transmission Line Length/ Voltage: | 10 km,132 kV Double Circuit up to Chilime Hub |