Assignment Help, Cloud Based ERP System, Microsoft NAV Certification
WELCOME !!

Please Register, ask for assignment solutions & post the solutions if you know any.

LETS START POSTING YOUR IDEAS AND THOUGHTS AND BUILD THE COMMUNITY OF EXPERTS.

Assignment Help, Cloud Based ERP System, Microsoft NAV Certification
WELCOME !!

Please Register, ask for assignment solutions & post the solutions if you know any.

LETS START POSTING YOUR IDEAS AND THOUGHTS AND BUILD THE COMMUNITY OF EXPERTS.

Assignment Help, Cloud Based ERP System, Microsoft NAV Certification

Stock Market, Online Tutoring, Cloud Based ERP System, Microsoft Dynamics Reporting, Microsoft Nav Certification


You are not connected. Please login or register

View previous topic View next topic Go down  Message [Page 1 of 1]

1Rasuwagadhi Hydropower Plant Empty Rasuwagadhi Hydropower Plant 17th June 2015, 5:09 pm

Formatted

Formatted
Administrator
Rasuwagadhi Hydropower Plant

Key Features of the Project
Type of Project:Run-of-River (ROR)
Design Discharge:80.00 m3/sec
Gross Head:167.90 m
Headworks:Diversion Weir with Undersluice and Side off lake Intake
Desander type and size:Underground, 3–Chamber of size125m x15m x12m
Tunnel Length & Size:4203m, Circular section of dia, 6m
Powerhouse:Underground Type
Turbine Type, Orientation & No.:Francis, Vertical Axis & 3 Nos.
Unit Capacity:38.50 MW
Generator Unit Capacity & Nos.:3 phase Synchronous AC, 3 x 43.75 MVA
Installed Capacity:111 MW
Annual Salable Energy:613.875 GWh
Dry Energy:84.318 GWh
Wet Energy:529.557 GWh
Transmission Line Length/ Voltage:10 km,132 kV Double Circuit up to Chilime Hub